Perencanaan Persediaan Bahan Baku Produk Kursi Anyaman Pada PT. Multi Kadera Sejati

Main Article Content

Elsa Budi Ardhania
Erni Puspanantasari Putri

Abstract

PT Multi Kadera Sejati is a company in the furniture industry that has always prioritised quality in the production of woven chairs. One of the problems that PT. Multi Kadera Sejati is a shortage of raw materials for woven chairs, apart from that, there is no optimal raw material inventory control system and they still use the conversion method, which results in the company experiencing production delays and hampers the delivery process to consumers, which can reduce consumers' confidence in ordering woven chairs from PT. Multi Kadera Sejati. The forecasting methods used in this research are Moving Average and Exponential Smoothing. In Material Requirement Planning (MRP), LFL and FPR lot-sizing techniques are considered to be able to solve this problem. The LFL method was chosen because it has the smallest results and the most optimal results. From the results of MRP calculations with LFL and FRP lot sizing, it was found that the lowest cost for LFL was IDR 1,350,000.

Article Details

How to Cite
[1]
E. B. . Ardhania and E. P. Putri, “Perencanaan Persediaan Bahan Baku Produk Kursi Anyaman Pada PT. Multi Kadera Sejati”, JSE, vol. 9, no. 3, Jun. 2024.
Section
Articles

References

N. Zunita and M. H. Yusuf, “Perencanaan Persediaan Bahan Baku Pupuk Dolomit Menggunakan Metode Material Requirement Planning ( MRP ),” vol. 4, no. 2, pp. 266–273, 2023.

M. R. R. Suseno, “Analisis Pengendalian Persediaan Bahan Baku Dengan Metode Material Requirement Planning (Studi Kasus : PT. Aneka Adhilogam Karya),” vol. 20, no. 1, pp. 105–123, 2022.

Eddy Herjanto, Manajemen Produksi & Operasi, Edisi Kedua. Jakarta, 1999.

D. K. Sofyan, Perencanaan & Pengendalian Produksi, Edisi Pert. Yogyakarta, 2013.

A. Kusumawati and A. D. Setiawan, “Analisis Pengendalian Persediaan Bahan Baku Tempe Menggunakan Material Requirement Planning,” Ind. Serv., vol. 3, no. 1b, pp. 168–173, 2017, [Online]. Available: http://jurnal.untirta.ac.id/index.php/jiss/article/view/2079/1612

Santoso and Rainisa M. Heryanto, Perencanaan Dan Pengendalian Produksi 1. 2017.

& dkk Eunike, A., Perencanaan Produksi dan Pengendalian Persediaan. 2021.

A. Kahfi, B. Sumartono, and B. Arianto, “Analisis Perencanaan Bahan Baku Perakitan Lemari dengan Metode Material Requirement Planning (MRP) pada Bengkel Furniture,” J. Tek. Ind., vol. 9, no. 1, pp. 39–57, 2020.

D. N. Rahayu and J. Purnama, “Pengendalian Persediaan Bahan Baku Shuttlecock Guna Memenuhi Permintaan Konsumen (Studi Kasus : UD Nusa ),” Profisiensi J. Progr. Stud. Tek. Ind., vol. 11, no. 1, pp. 050–059, 2023, doi: 10.33373/profis.v11i1.5278.

T. Ernita, R. Ervil, and R. Meidy, “Perencanaan Persediaan Bahan Baku Dengan Metode Material Requirement Planning (Mrp) Pada Proses Produksi Bak Mobil Truk Di CV. Lursa Abadi Kota Padang,” J. Sains dan Teknol. J. Keilmuan dan Apl. Teknol. Ind., vol. 21, no. 1, p. 40, 2021, doi: 10.36275/stsp.v21i1.357.

I. Mahendra Damayoki, “Analisis Perencanaan Persediaan Bahan Baku dengan Metode Material Requirement Planning di UD. Karya Logam Steel,” 2022.

H. M. Darmayanti, T. Hernawati, and B. Harahap, “Perencanaan Kebutuhan Bahan Baku Produk Kue Bawang Abon Menggunakan Metode Mrp (Material Requirement Planning),” Bul. Utama Tek., vol. 17, no. 3, pp. 286–290, 2022, [Online]. Available: https://jurnal.uisu.ac.id/index.php/but/article/view/5375

D. H. Dwi Purnama, “Perencanaan Dan Pengendalian Bahan Baku Produksi Kerupuk Dengan Metode MRP Untuk Meminimumkan Biaya Persediaan Bahan Baku di UD. XYZ,” 2020.

M. R. Lizamza, “Analisis Perencanaan Persediaan Bahan Baku Batu Bata Dengan Metode Material Requirement Planning (MRP) ( Studi Kasus UKM Batu Bata Wisnu Dasjak ),” 2019.

B. Heizer, Jay & Render, Manajemen Operasi : Manajemen Keberlangsungan dan Rantai Pasokan. 2015.