Analisis Beban Kerja dengan Metode Work Sampling Pada Pegawai Bidang Akademik (Studi Kasus: Fakultas Teknik di Perguruan Tinggi X)

Main Article Content

Hery Murnawan
Febrian Lestari

Abstract

Workload is a measure of each individual's performance of their duties and authority according to the SOP, within the specified working hours, and the results must meet the target. Workload can refer to the level of productivity and performance of employees in an organisation. The Faculty Unit at College X is one of the work units under the auspices of the Rector of the College. This research uses the observation method as a data collection technique and the work sampling method as a data analysis method. The results of the research show that the educational staff with the position of administrative implementer of the 1st civil engineering study programme have the highest workload with 86.6%, and the lowest workload belongs to the administrative implementer of the 1st civil engineering study programme with 58.1%. The average standard time needed to complete an activity is 22.9 minutes, so it is recommended to have an even distribution of workload.

Article Details

How to Cite
[1]
Hery Murnawan and F. Lestari, “Analisis Beban Kerja dengan Metode Work Sampling Pada Pegawai Bidang Akademik (Studi Kasus: Fakultas Teknik di Perguruan Tinggi X)”, JSE, vol. 9, no. 3, Jul. 2024.
Section
Articles

References

A. Syawaludin dan H. F. Satoto, “Analisis Beban Kerja Fisik dan Mental Pada Pekerja UD. Nuraji Pot,” Jurnal Sistem dan Teknik Industri (JUSTI), vol. 3, no. 4, pp. 503–513, Jul. 2022.

W. Widiasih dan H. Nuha, “Workload Analysis Using Work Sampling and NASA-TLX for Employee of Private University in Surabaya,” Jurnal Ilmiah Teknik Industri, pp. 134–141, Dec. 2019, doi: 10.23917/jiti.v18i2.8274.

A. B. R. Syapujagat dan S. Mundari, “Analisis Beban Kerja untuk Menentukan Jumlah Tenaga Kerja (Studi Kasus UD. Bangkit Bersama),” Prosiding Senakama, vol. 2, pp. 33–45, Jan. 2023.

F. A. Sholikah, D. Andesta, dan E. D. Priyana, “Analisis Jumlah Pegawai Berdasarkan Perhitungan Beban Kerja Fisik dan Beban Kerja Mental dengan Metode Workload Analysis dan NASA-TLX (Studi Kasus: Pegawai Office PT. XYZ),” Serambi Engineering, vol. VII, no. 4, pp. 3664–3671, Oct. 2022.

A. Gustarico dan E. P. Putri, “Analisis Produktivitas untuk Meningkatkan Hasil Produksi dengan Menggunakan Metode Objective Matrix (Omax) (Studi Kasus : CV Bakso Empal Sapi),” Jurnal Teknik Industri Terintegrasi (JUTIN), vol. 6, no. 3, pp. 515–525, 2021.

H. Murnawan dan Musthofa, “Perencanaan Produktivitas Kerja dari Hasil Evaluasi Produktivitas dengan Metode Fishbone dDi Perusahaan Percetakan Kemasan PT. X,” Jurnal Teknik Industri HEURISTIC, vol. 11, no. 1, pp. 27–46, Apr. 2014.

D. Putro Utomo dan J. Purnama, “Analisis Produktivitas dengan Metode Marvin E. Mundel Pada PT. Indo Lautan Makmur,” Journal of Industrial Engineering and Management System, vol. 16, no. 1, pp. 1–8, 2023, [Online]. Available: https://journal.ubm.ac.id/index.php/jiems

N. Rahmiyati dan M. A. Rahim, “Peningkatan Produktivitas dan Kualitas Produk Melalui Penerapan Teknologi Tepat Guna Pada Usaha Pengembang Ekonomi Lokal Di Kota Mojokerto Propinsi Jawa Timur,” Jurnal Pengabdian LPPM Untag Surabaya, vol. 1, no. 2, pp. 171–182, Nov. 2015.

T. Tamam dan Sajiyo, “Analisis Beban Kerja serta Pengaruhnya Terhadap Kelelahan Kerja dan Produktivitas Kerja Di PT. Elang Jagad,” Journal of Industrial Engineering and Management System, vol. 16, no. 1, pp. 40–48, 2023, [Online]. Available: https://journal.ubm.ac.id/index.php/jiems

A. Octaviana, D. A. Rachmawati, dan Y. Nurdian, “Hubungan Antara Beban Kerja Fisik dengan Kualitas Produk Hidup Kuli Panggul Di Pasar Pabean Surabaya,” Al-Sihah : Public Health Science Journal, vol. 11, no. 1, pp. 18–30, Jun. 2019.

S. Fauzi, “Analisis Beban Kerja Mental Menggunakan Metode NASA-TLX untuk Mengevaluasi Beban Kerja Operator Pada Lantai Produksi PT. PP. Londonsumatra Indonesia Tbk, Turangie Palm Oil Mill, Kabupaten Langkat,” Skripsi, Universitas Medan Area, Medan, 2017.

Fred E. Meyers and James R. Stewart, Motion and Time Study for Lean Manufacturing. Upper Saddle River, 2002.

Sutalaksana, Teknik Tata Cara Kerja, vol. 1. 1979.

Sritomo dan Wignjosoebroto, Ergonomi, Studi Gerak dan Waktu : Teknik Analisis untuk Peningkatan Produktivitas Kerja, 1st ed. Surabaya: Guna Widya, 1989.

Wignjosoebroto dan Sritomo, Ergonomi, Studi Gerak dan Waktu. Jakarta: Guna Widya, 2008.