Analisis Pengaruh Ketidakstabilan Debit Air Dan Curah Hujan Terhadap Daya Pada Pembangkit Listrik Tenaga Mini Hidro (PLTM) Karo Bumi Energi
Main Article Content
Abstract
Mini hydro power plants (PLTM) are capable of producing electricity continuously for 24 hours. The amount of energy distributed by the Mini Hydro Power Plant (PLTM) is greatly influenced by the strong flow of water coming from upstream, so the effect of rainfall is relatively direct on the electricity produced by the Karo Bumi Energi Mini Hydro Power Plant (PLTM) with a capacity of 2 x 4, 85 MW. From the observations, rainfall is a dry month, it can also be seen that rainfall, water discharge and production are directly proportional. In May, June and July there is a very significant difference between production and water discharge. According to observations, these months are wet months with very high rainfall. The resulting productivity of hydropower plants is influenced by the creation and release of stable water without aggravation. The higher the creation and release of water, the higher the efficiency of the power supplied. The impact of high rainfall will cause the water release to reach 11,653m3 / hour.
Article Details
This work is licensed under a Creative Commons Attribution 4.0 International License.
References
AL. K. Krishnalstalnal, L. Jalsal, ALnd AL. I. Weking, “Studi ALnallisis Perubalhaln Debit Daln Tekalnaln ALir Paldal Pemodelaln Pembalngkit Listrik Tenalgal Mikro Hidro,” Malj. Ilm. Teknol. Elektro, Vol. 17, No. 2, P. 257, 2018, Doi: 10.24843/Mite.2018.V17i02.P14
Baldaln Meteorologi, Klimaltologi, daln Geofisikal (BMKG), 2019
ALzhalr ALdi D, Ernalwaln S. ALnallisal Hubungaln Curalh Hujaln Daln Debit Sertal Koleralsi Pengalruh Palralmeter Lalin Di Daleralh ALliraln Sungali Bralntals Hulu” Seminalr Nalsionall Teknologi daln Rekalyalsal (SENTRAL) 2018 ISSN (Cetalk) 2527-6042
I. Kurnialdy, AL. ALmrinsyalh, ALnd AL. ALmirsyalm, “Kalpalsitals ALliraln Terhaldalp Dalyal Turbin.” J.Electr. Syst. Control Eng., Vol. 2, No. 2, 2019, Doi: 10.31289/Jesce.V2i2.2359
Lal Ode Mohalmmald Firmaln & Balsuki Setialwaln, 2023, Dalsalr-Dalsalr Pembalngkit Listrik Tenalgal ALir, Penerbit: Widinal Medial Utalmal, ISBN: 978-623-459-597-0
Lukals, D. Robi, H. H. Tumbelalkal. “Studi Kinerjal Pembalngkit Listrik Tenalgal ALir (PLTAL) di Daleralh ALliraln Sungali (DALS) Bralntals”. Jurnall Teknik Elektro, Vol. 10, No. 1, Malret 2017, 17-23
M. L. Halkim., N. Yunialrti, Sukr, E. S. Dalmalrwaln. “Pengalruh Debit ALir Terhaldalp Tegalngaln Output Paldal Pembalngkit Listrik Tenalgal Picohydro” Jurnall Edukalsi Elektro” Vo. 4, No.1 (2020)
Muhalmmald Luthfi Halkim, Nurhening Yunialrti, Sukri, Eko Swi Dalrmalwaln, “Pengalruh debit alir terhaldalp tegalngaln output paldal pembalngkit listrik tenalgal pico hydro” Jurnall Edukalsi Elektro, Vol. 4, No. 1, 2020
Palrlin Sialgialn,” Potensi Energi ALngin Kecepaltaln Rendalh Untuk Pembalngkit Listrik Dengaln Modifikalsi Turbin Jenis Icewind”Journall of Informaltion Technology alnd Computer Science (INTECOMS) Volume 6 Nomor 2, Desember 2023 e-ISSN : 2614-1574 p-ISSN : 2621-3249
S. ALnwalr, M. T. Talmalm., I. H. Kurnialwaln. “Ralncalng Balngun Sistem Pembalngkit Listrik Tenalgal ALir Menggunalkaln Konsep Hydrocalt” RESISTOR (Elektronikal Kendalli Telekomunikalsi Tenalgal Listrik Komputer) Vol. 4 No. 1 e-ISSN : 2621-9700, p-ISSN : 2654-2684
S. Ointu, F. E. P. Surusal, ALnd M. Zalinuddin. “Studi Perencalnalaln Pembalngunaln Pembalngkit Listrik Tenalgal Mikrohidro (PLTMH) Berdalsalrkaln Potensi ALir Yalng ALdal Didesal Pinogu” Jalmbural J. Electr. Electron. Eng., Vol.2 Pp. 30–38, 2020, Doi: 10.37905/Jjeee.V2i2.4618
W. Romaldhoni, D. Sulalimaln, Purnalmal “ALnallisis potensi pembalngkit listrik tenalgal mikro hydro paldal alnalk sungali di bulungaln” Jurnall Kumpuraln Fisikal, Vol. 4 No. 1, ALpril 2021, Hall. 61-66